What must inspectors regularly verify concerning SESC measures?

  1. Funding for the projects

  2. The effectiveness of erosion control

  3. Local public support

  4. The timeline of implementations

The correct answer is: The effectiveness of erosion control

Inspectors must regularly verify the effectiveness of erosion control measures implemented under the Stormwater Erosion and Sediment Control (SESC) guidelines. This is crucial because the primary purpose of SESC measures is to minimize erosion and sedimentation that can occur during land-disturbing activities. By assessing effectiveness, inspectors ensure that the erosion control techniques in place are functioning as intended to prevent sediment from entering waterways and causing environmental harm. This verification process often involves monitoring conditions to determine if the measures are adequately controlling soil erosion and if adjustments or additional measures are needed to enhance effectiveness. Ensuring the effectiveness of erosion control not only protects water quality but also complies with regulatory requirements. This ongoing assessment is part of a proactive approach to stormwater management that ultimately supports better land-use practices and environmental protection.