What is required for each project regarding inspections under Part 31 and 91?

  1. Inspected, recorded

  2. Inspected, documented

  3. Reviewed, noted

  4. Validated, archived

The correct answer is: Inspected, documented

In the context of stormwater management regulations, specifically under Parts 31 and 91, inspections must be both inspected and documented for each project. This requirement emphasizes the importance of both conducting thorough inspections and having a formal record of those inspections. The inspection process involves assessing compliance with stormwater management practices and ensuring that all measures are functioning as intended and are effective in preventing pollution. However, it is equally crucial to document these inspections. Documentation serves several purposes: it provides evidence of compliance, supports accountability, and allows for tracking changes or improvements over time. It can also be a critical piece of information during audits or assessments by regulatory agencies. While other options include processes like reviewing or validating, they do not emphasize the dual necessity of conducting inspections and maintaining a clear and systematic record, which is essential to meet regulatory standards and ensure environmental protection. This dual requirement helps to maintain a high standard of oversight necessary for protecting water quality.